Workplace drug testing methods
Testing for drug use on construction sites and in the workplace is intended to protect people and premises while ensuring that an employer’s responsibilities under the Health and Safety at Work Act have been met. There are several different testing methods, each with their own benefits.
When selecting a testing programme, employers can evaluate the answers to several questions, including:
- Is saliva testing a viable option? In environments where safety and timing are priorities, saliva testing may be preferred, since it can determine if someone is currently under the influence of drugs. Saliva testing can produce a positive result if the individual had taken drugs in the last two hours. Saliva testing is generally not prone to contamination.
- Is urine testing a viable option? While saliva testing may be suitable for some sensitive environments, urine testing may be suitable in instances where random testing policies are in place. This method can provide instant, in-house results that may be able to prevent accidents from happening on site in the first place. However, urine testing may not provide reliable results in instances where very recent substance activity has occurred - or if the test participant is under the influence at the time the sample was taken. Generally, urine tests are unable to detect drugs that have been taken in the 48 hour time period immediately prior to the test.
- What is the test’s cut-off level for each drug? This factor establishes how much of a drug can be present in a person’s system before its presence is detected by the test. If this level is low, the kit will be more sensitive to a positive result.
[edit] Related articles on Designing Buildings
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February